Changing or Cancelling an Order
Stopping an Order in an Emergency
You can immediately stop an order by using the Emergency Stop button on the Order Details screen. By default, this will immediately stop the current order, but will not affect future orders. The customer will only be charged for the water that is delivered.
- You can make the Emergency Stop function available in the Irrigator Portal by setting the Customer Emergency Stop parameter to YES (available) or NO (not available). This can be set at the System, Group, Area, and Outlet levels. The setting on the most specific level applies - for example, the setting on the Outlet overrides the setting on the Area.
- You can configure this behaviour so that any existing presets for the gate are also disabled. See Configuring Emergency Stop and Presets for details.
- You can set the outlet as stopped to prevent any other orders from being placed at the outlet. See Disabling Ordering for details.
Cancelling an Order
Cancel an order from the Orders module or from the Order Details form in the Planning Schematic. You cannot cancel an order that has already run, or is in progress (use the Emergency Stop button if the order must be stopped immediately). If the order has not yet finished, you can change the finish time.
To cancel an order, select the order and click Cancel the current order on the order toolbar.
Changing an Order
A customer may want to make changes to an order before it starts, or to change the finish time of an order that has already started.
You can change orders in the Orders module, or in the Planning Schematic. The type of change you should make depends on the order status:
Order Status | Description |
---|---|
Requested |
Make the changes in the Orders module to the Requested order items |
Scheduled |
Make the changes to the scheduled item in the Planning Schematic. A scheduled order has already been included in a plan, so any changes to the order should be made by the planner so they can assess the impact of the changes on the rest of the plan. |
Estimated |
Ideally the changes should be made by the Planner in the Planning Schematic so that the impact on other orders can be managed.
In this case, update the estimated order items. The scheduled items cannot be updated. |
To change an order:
- Open the order details in either the Orders module or in the Planning Schematic. The order items are listed in the Order Items panel at the bottom of the screen.
- Use the order status tabs to the left of the Order Items list to choose the order items to change. For example, choose the Estimated tab to change any Estimated order items.
- Choose the type of change you want to make by clicking the buttons to the right of the list. The buttons are enabled if a change is possible:
Option Description Modify Products
Choose this button to change the crop types for the order.
Modify
Choose this button to change start and end times and flow rate.
Advanced
Choose this button if you want to change or add flow items to the order.
- Make your changes, then click Save to save the changes.
Change crop types
- Click the Modify Products button.
- In the Change Crops window, make changes to the Flow Rate by Crop Type. The sum of the flow rates for the crop types must be the same as the Item Flow Rate. Only crop types that were valid when the order was placed will be displayed in the list.
- Click Submit to save your changes.
Change the start or end time, or the flow details for an order
- Click the relevant Modify button, or use the Advanced Modify button for multiflow orders.
- Enter the following details as necessary:
Property Description Start Time
Change the order start time. This changes the finish time but not the duration.
If you are changing the start time, you can select the Requested by Customer checkbox to record that the change was requested by the customer.
Note
Changes to order start times that the customer has agreed to or has requested are recorded as the Requested start time so that delivery performance can be calculated correctly.
If the change was not requested by the customer, the original Requested start time is not changed.
This information is used by the Irrigation and Scheduling Performance Report to calculate order delivery performance statistics.
Finish Time
Change the order finish time.
This changes the duration, but not the start time.
Flow Rate
Change the flow rate. For an order with multiple flows, choose the Advanced option instead of the Modify option.
For changes to flow rates, you can use the Flow Change field to indicate whether the notice given by the customer was considered Acceptable or Unacceptable, or whether no notice was given by the customer but the change was Detected by a field officer. This field will be enabled when you make a change to the flow rate field.
Duration
Change the duration of the flow.
This changes the finish time, but not the start time.
- Click Submit to save your changes.
To change or add flow items within the order
- Click the Modify Products button.
- In the Change Crops window, make changes to the Flow Rate by Crop Type. The sum of the flow rates for the crop types must be the same as the Item Flow Rate. Only crop types that were valid when the order was placed will be displayed in the list.
- Click Submit to save your changes.